濟(jì)南停車棚:自建車棚需要的材料和工具

來(lái)源:http://m.cnqingdu.com/ 日期:2024-11-16 發(fā)布人:

  材料:鋼材、膜材料、亞克力板、水泥砂漿、透水磚等。鋼材的選擇上,可以使用10cm10cm的方管作為承重鋼柱,4cm8cm的方管作為梁。車棚的頂部可以選擇膜結(jié)構(gòu),這樣可以增加車棚的耐用性和藝術(shù)感。

  Materials: steel, film materials, acrylic sheets, cement mortar, permeable bricks, etc. In terms of steel selection, 10cm10cm square tubes can be used as load-bearing steel columns, and 4cm8cm square tubes can be used as beams. The top of the carport can choose a membrane structure, which can increase the durability and artistic sense of the carport.

  工具:需要水準(zhǔn)儀、電錘、電焊機(jī)、切割機(jī)等工具。在地下埋好鋼板之后,用電焊機(jī)和水準(zhǔn)儀確保鋼柱的水平,然后將鋼柱與之焊接好,注意每塊鋼板之間的距離。

  Tools: Requires tools such as level gauges, hammers, welding machines, cutting machines, etc. After burying the steel plates underground, use an electric welding machine and a level to ensure the levelness of the steel columns, and then weld the steel columns to them, paying attention to the distance between each steel plate.

  搭建步驟:

  Construction steps:

  基礎(chǔ)施工:進(jìn)行素土夯實(shí),確?;A(chǔ)穩(wěn)固。然后依次鋪設(shè)C15墊層和3:7灰土墊層。使用1:3干硬性水泥砂漿進(jìn)行找平。

  Foundation construction: Firstly, compact the plain soil to ensure the stability of the foundation. Then lay C15 cushion layer and 3:7 lime soil cushion layer in sequence. Use 1:3 dry hard cement mortar for leveling.

02

  鋼結(jié)構(gòu)加工:將鋼材進(jìn)行除銹處理后,根據(jù)設(shè)計(jì)圖紙進(jìn)行下料和放樣。鋼材焊接時(shí)要嚴(yán)格遵守焊接規(guī)范,確保焊接質(zhì)量。

  Steel structure processing: After rust removal treatment, the steel is cut and laid out according to the design drawings. Strictly follow the welding specifications when welding steel to ensure welding quality.

  膜面加工:根據(jù)設(shè)計(jì)要求裁剪膜面,確保膜面的均勻性和張拉性。在現(xiàn)場(chǎng)搭建時(shí),注意膜面的拉伸強(qiáng)度和補(bǔ)強(qiáng)。

  Membrane processing: Cut the membrane surface according to design requirements to ensure uniformity and tension of the membrane surface. During on-site construction, pay attention to the tensile strength and reinforcement of the membrane surface.

  安裝:將鋼結(jié)構(gòu)組件運(yùn)輸?shù)浆F(xiàn)場(chǎng),按照設(shè)計(jì)圖紙進(jìn)行組裝和焊接。確保每個(gè)連接點(diǎn)的牢固和穩(wěn)定。

  Installation: Transport the steel structure components to the site and assemble and weld them according to the design drawings. Ensure the firmness and stability of each connection point.

  細(xì)節(jié)處理:完成焊接后,對(duì)焊接處進(jìn)行超聲波檢查,確保沒(méi)有不合格的焊縫。進(jìn)行防銹噴漆處理,保護(hù)鋼結(jié)構(gòu)。

  Detail processing: After completing the welding, conduct ultrasonic inspection on the welding area to ensure that there are no unqualified welds. Finally, rust proof painting treatment is carried out to protect the steel structure.

  本文由濟(jì)南停車棚為您提供,我們的網(wǎng)站是:http://m.cnqingdu.com我們將以全心全意的熱情為您提供服務(wù),歡迎您的訪問(wèn)!

  This article is provided by Jinan Parking Shed. Our website is: http://m.cnqingdu.com We will provide you with wholehearted enthusiasm and welcome your visit!

此文關(guān)鍵詞:Array  Array  Array  Array  

閱讀/ Recommended reading

  推拉篷的篷布更換周期受多種因素影響,包括材質(zhì)、使用環(huán)境、維護(hù)保養(yǎng)情況以及使用頻率等。以下是關(guān)于篷布更換周期的具體分析:  The replacement cycle of th...